XB Internal constraints
C. Set backsD. None of the above12: Aconsists of the aims and goals of the project the method ofachieving those aims and the resources needed in the methodA Feasibility studyB PlanC Work break down structureD. Initial phase13: Thabo has come up with an idea that would increase the profits of his comHe is therefore considered to be the project’sA SponsorB. Originator